TL;DR

One week to go in the sprint and it will all come down to how quickly our team of volunteers, contractors, plus Bryan, and I can wrap up manufacturing of the Alpha test units.  While we would like to be further along (as shown by our burn down chart), we have a couple of weeks after the sprint ends before SyndCon and we are confident we will deliver the Alpha units at con.

Backlog – See SyndCon Task List tab for current sprint plan and Backlog tab for full backlog.

Reports

J.

Did

  • Finalized the order for full run of controller housings; they have been shipped
  • Finalized design and ordered test run for tone ring plastic components; it has been shipped
  • Got us listed in SyndCon raffle annoucnements

Will Do

  • (Hopefully) Finish controller housings
  • (Hopefully) Test production tone rings and order full batch of plastic parts
  • Start drafting panel presentation for SyndCon

Blocks?

  • Waiting on production run parts for controller housing and tone rings

Bryan

Did

  • Finalize Alpha Tester shirt logistics

Will Do

  • Order Alpha Tester shirts
  • Send out updated terms and info on bikes to order
  • Get controllers built

Blocks?

  • All controller parts and jig are with volunteer, so cannot do controller assembly work ourselves